The finished product - minus the landscaping!

Tuesday, September 1, 2009


A major accomplishment happened today - the bathroom layout got figured out. You would have thought this would have been an easy feat. No way. Aaron and Brent worked on the layout for hours on Monday, trying to meet all the VA specs and ensure RJ had all the turning around space he'd need. They used tons of chalk, snapping lines on the floor to see the layout of fixtures, they brought in a computer to lay it out on the screen, they drew on the studs, floor, and scrap wood. After much frustration, stress, and almost tears (me, not them - I thought I might lose my whirlpool tub!), and a phone call to the VA, it was figured out. The original plan plus flipping the room around and it's good to go. Plus, it even looks more spaced out. And to top it all off, they didn't have to move the window. Which made Brent and John extremely happy.

No comments:

Post a Comment